Low Graphics Version
A A A
Thursday, May 23, 2013
About The CityCity HallCity ServicesHow Do I...Elected OfficialsThings To Do...Contact Us
Homepage > ... > Public Works > Engineering Division > Design Policy and Procedure Documents
E-mail story
  • Send a link
Print friendly format
  • Design Policy and Procedure Documents
  • Engineering Development Resources
  • Engineering Fee Schedule
  • General Information
  • Other Information
  • Standard Drawings
  • Storm Water Requirements
  • Submittal Requirements
  • Traffic
  • Capital Improvement Program (CIP)
  • Trench Cut Moratorium Locations
Public Works - Design Policy and Procedure Documents
Grading Design Policies and Procedures
Street Improvement Design Policies and Procedures
Sewer Design Policies and Procedures
 Storm Drain Design Policies and Procedures
Street Lighting Design Policies and Procedures. You will also need to download Standard Drawing Nos. SL-1 and SL-2.
Traffic Engineering Design Policies and Procedures
Shared Parking Design Policies and Procedures

Parks and Recreation Requirements for New Construction

About The CityCity HallCity ServicesHow Do I...Elected OfficialsThings To Do...Contact Us
Powered by:

Plug-ins & Readers:

We're Social:

  • Facebook
  • Twitter
  • Youtube
  • Linkedin
Privacy Policy
Copyright © 2000 - 2013 City of San Bernardino, CA

Translate to:

Spanish / Español
Public Works Department
300 N. "D" Street - 3rd Floor
San Bernardino, CA 92418-0001
T. 909-384-5140